snowfall
0”
since 6AM
3”
24 hour
3”
overnight
4”
48 Hour
snow graph
0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
5
6
7
8
9
INCHES
This Season
temps
26°
7 mph
Tram Summit
34°
1 mph
Mid-Mountain
40°
1 mph
Tram Base
lifts
0 /12
LIFTS OPEN
TRAM CLOSED
terrain
98 /131
Trails Open
40
Groomed Trails
detailed forecast
  • Today
    /
  • /
  • /
Cody Bowl
Cody Bowl
Summit of the Teton Lift
Summit of the Teton Lift
Base of the Teton Lift
Base of the Teton Lift
Top of Gondola
Top of Gondola
Thunder Chair, Tower 2
Thunder Chair, Tower 2
Casper Chair
Casper Chair
Tram Station Cam
Tram Station Cam
Base of Bridger Gondola
Base of Bridger Gondola
Sweetwater Gondola, Teewinot Base
Sweetwater Gondola, Teewinot Base
Après Vous from Teton Village
Après Vous from Teton Village
Mountain View
Mountain View
Apres Vous
Apres Vous
1-888-DEEP-SNO
snowfall
3”
24 Hrs
547”
This Season
Photo of the day Videos

Event Details

Sweetwater Gondola Opening

Date: Sat Dec 17, 2016
Time: 9:30AM
Location: Teton Village




Jackson Hole Mountain Resort is excited to announce the opening of a new gondola this Saturday, December 17th at 9:30AM. Join the opening festivities with live music, giveaways and more!
The Sweetwater Gondola will be located between the Bridger Gondola and Teewinot High Speed Quad will have a mid-station approximately a third of the way up the mountain in the Solitude area, then continues up to terminate just uphill of the Casper Restaurant.

More Info

Schedule of Events

  • Live Music from ‘86’ starting at 9am
  • MSS and JHSC kids’ seasonal groups will assemble for ceremony
  • Cocoa and cookies for guests
  • Opening ceremony, with brief speeches, blessing, and ribbon cutting
  • Loading of first cabins, followed by Santa sighting
  • Giveaway surprises in Gondola cabins
  • Kid’s GoPro Treasure Hunt on lower Sweetwater

Event Schedule: 

  • 8:00am – Snowcat will be placed for band and speakers to present from, kids course/demo set on either Pooh Bear/Antelope Flats or lower Eagle’s Rest
  • 9:30am - Dedication Ceremony by Jerry Blann and the Kemmerers
  • 9:40am - dedication of Gondola by Pastor Pascal
  • 9:43am - The Kemmerers load the first gondola
  • At midstation, Edge Imaging take photos of cabins with doors opening
Back to Top Link